Asbestos Removal
What fun we've had this week. All taped up with a bleeping beeping monitor checking our air. The dogs are going mad and there's all this pounding down below in case it's not noisy enough. They are removing the asbestos. Here's what I found out: "If removal is to be performed when users are still present in the building, it is usually necessary to relocate some users temporarily. Typically, the part of the building from which asbestos is being removed has to be sealed off in order to prevent contamination of the other areas. Methods of sealing off an area often include the use of Polyethylene film, duct tape and negative air pressure machines which are fitted with HEPA filters. The idea is that the contained area is pulling fresh air in as to not allow asbestos fibers into the surrounding environment. Only a special vacuum cleaner that's designed for asbestos containment (class H) can be safely used when cleaning up during and after asbestos removal. Ordinary vacuum cleaners cannot be used, even those fitted with a HEPA filter. An ordinary vacuum cleaner will expel the asbestos fibres into the room air.
If the building is closed to normal users, it may be necessary to seal it off from outside atmosphere so that no accessible air is contaminated. Examples of asbestos removal enterprises include the Jussieu Campus (begun circa 1996 and still going on as of 2005) and the Tour Montparnasse (in 2005, projected duration was three years if the tower was emptied of its users, and ten years if it were not). ... The asbestos removal may take longer and cost more than the actual demolition. For example, the former seat of parliament of East Germany, the Palast der Republik, was stripped of most of its asbestos between 1998 and 2001, before it was finally demolished starting in 2006."
So, how long will this take? Before demolition.

No comments:

Post a Comment

LinkWithin

Related Posts with Thumbnails